A western E&C firm was given the task of design and fabrication of three fired heaters. SAS was contracted to ensure that process conditions could be achieved in the furnaces. Over a three-month period, specialized consulting (CFD analysis, controls, burner selection, etc.) was provided to our client. Design was completed on time and within budget.