Design Assistance for Fired Heaters

A western E&C firm was given the task of design and fabrication of three fired heaters. SAS was contracted to ensure that process conditions could be achieved in the furnaces. Over a three-month period, specialized consulting (CFD analysis, controls, burner selection, etc.) was provided to our client. Design was completed on time and within budget.

This entry was posted in Case Studies. Bookmark the permalink.