SAS Incorporated logo

Client confidential 1

Design assistance for fired heaters

A western E&C firm was given the task to design and fabricate three fired heaters. SAS was then contracted to ensure that process conditions could be achieved in the furnaces.

Over a three month period, SAS  provided specialized consulting, including full CFD analysis, controls and  burner selection to the client. As a consequence, the design and fabrication project was completed on time and within budget.